Initial Construction

Corrals were ordered and assembled on the lake shore. Assembling the corrals included: bolting together the yellow floats and bars, fastening the skirt to the bar, threading a chain through the bottom of the skirt, and tying the skirt up with string.


Once constructed, the corrals were pulled off-shore by the marsh master. In the water, the skirts were untied and dropped and the corrals were anchored to the bottom of the lake.

Return to Main Limnocorrals Page

BYU Environmental Engineering Laboratory

Brigham Young University
Dept. of Civil and Environmental Engineering